Myanmar-Japan Technological Development Center-2 (MJTDC-2), one of the two main research centers of Yangon Technological University was donated by the people of Japan under the management of JICA and handed over to Myanmar Government led by Aung San Suu Kyi on the 26th December 2019. The project was a part of the Grant Aid "Project for Enhancing Technological Universities" (Grant Amount: 2,582 million Japanese Yen - Approx. 35.2 billion MMK).
The center is located near MJTDC 1 and canteen and can be directly accessed by large vehicles.
The MJTDC 2 is a three-story building, which is dedicated to the Civil Engineering researches. Both research centers are provided with advanced laboratory equipment.
JICA has been supporting YTU in capacity development of the teaching staffs through the Technical Cooperation "Project for Enhancing Engineering Higher Education (EEHE)". Under the project, 44 young teaching staffs were sent to Japan, and most of them have already returned to Myanmar after obtaining a Ph.D. degree from Japan. The research centers and laboratory equipment will enable YTU researchers including those who study in Japan to proceed further with more advanced researches using the new equipment.(According to JICA)
This room is comprised of a reaction floor, an L-shaped reaction wall, a shake-table with a loading platform, a universal testing machine work space, fatigue testing machine work space and an overhead travelling crane.
Storage for the control units for the hydraulic jacks and shake-table used in the Structural Testing Room.
A space for observation of structural testing is installed in the upper floor of the Structural Testing Room with access via stairs. This space is also be used for unloading into the Soil Basic Lab using the overhead travelling crane.
The hydraulic power source for the jacks and shake-table used in the Structural Testing Room are positioned here.
Strength testing, durability testing, and mortar testing, etc. will be carried out here.
The properties of fresh concrete, etc. will be tested here.
Storage for the cement used in the concrete mixing tests, etc.
A water tank for curing concrete test pieces, heating and cooling equipment are installed.
This room is in order to enable shared use of the shake-table installed in the Structural Testing Room.
The equipment and materials needed for various soil property experiments are positioned here.
The power source for the Soil Basic Lab and the equipment used in the Compressor Room are installed here.
The Testing Room is for the equipment and materials for wind tunnel testing in appropriate proportions.
The room includes the AC/impulse power source and peripheral equipment.
The distribution boards, automatic voltage regulators, and emergency generators for MJTDC 1 and 2 are installed here.
The water supply pumps and fire water pumps for MJTDC 1 and 2 are installed here.
A meeting space with seating for 8 persons is planned.
It provides lockers for between 12 and 16 persons, both male and female.
It is equipped both male and female toilet facilities.
It is to provide a department room for 2 on the ground floor and a department room for 5 on the first floor.